This project involved the installation of nearly 200 kilometres of large diameter cable between wind turbines – mostly through solid rock. The project required extensive backfilling with sand, ground rehabilitation and the construction of temporary access tracks. These logistical challenges were compounded by poor weather conditions during a wet winter.